BIG BEND ROAD over PARKER CREEK;MORTER BR
1.5 N. 4.8 W. COPELAND · County 021, Idaho · Built 1983 · 1 Lanes · 30 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
48.926303, -116.478592
This bridge is in worse condition than 69% of bridges in County 021. The average bridge in Idaho is 0 years old; this one is 43 years old.
Nearby Bridges
STC 5805;WESTSIDE over PARKER CREEK
Built 1970
STC 5805;WESTSIDE over LONG CANYON CREEK
Built 1956
STC 5804;COPELAND over KOOTENAI R.;COPELAND BR.
Built 1969
STC 5804;WESTSIDE over FISHER CREEK
Built 2003
STC 5805;WESTSIDE over SMITH CREEK
Built 1970
US 95 over WILDLIFE UNDERPASS
Built 2004
US 95 over WILDLIFE UNDERPASS
Built 2004
YUKON ROAD over MISSION CREEK;KELLOGG BR
Built 1978
US 95 over WILDLIFE UNDERPASS
Built 2004
STC 5804;WESTSIDE over TROUT CREEK;N.BRANCH
Built 1957
Bridge Details
- Structure #
- 000000000030390
- Year Built
- 1983
- Length
- 25.9 m (85 ft)
- Max Span
- 10.4 m
- Width
- 5.4 m (17.7 ft)
- Lanes
- 1
- Daily Traffic
- 30
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $513,000
- Total Project Cost
- $770,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.