STC 5805;WESTSIDE over LONG CANYON CREEK
3.2 S. 1.8 W. PORTHILL · County 021, Idaho · Built 1956 · 2 Lanes · 80 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
48.950233, -116.536
This bridge is in worse condition than 69% of bridges in County 021. The average bridge in Idaho is 0 years old; this one is 70 years old.
Nearby Bridges
STC 5805;WESTSIDE over SMITH CREEK
Built 1970
STC 5805;WESTSIDE over PARKER CREEK
Built 1970
BIG BEND ROAD over PARKER CREEK;MORTER BR
Built 1983
FS ROUTE NO. 2443 over SMITH CREEK
Built 1964
STC 5804;WESTSIDE over FISHER CREEK
Built 2003
STC 5804;COPELAND over KOOTENAI R.;COPELAND BR.
Built 1969
FS ROUTE NO. 2567 over BEAVER CREEK
Built 1979
FS ROUTE 281 over COW CREEK
Built 1984
FS ROUTE NO. 2545 over COW CREEK
Built 1964
US 95 over WILDLIFE UNDERPASS
Built 2004
Bridge Details
- Structure #
- 000000000020735
- Year Built
- 1956
- Length
- 30.5 m (100.1 ft)
- Max Span
- 16.8 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 80
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $718,000
- Total Project Cost
- $1,077,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.