STC 5804;WESTSIDE over FISHER CREEK
1.5S. 2.9W. COPELAND · County 021, Idaho · Built 2003 · 2 Lanes · 300 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
48.879944, -116.435861
This bridge is in worse condition than 69% of bridges in County 021. The average bridge in Idaho is 0 years old; this one is 23 years old.
Nearby Bridges
STC 5804;COPELAND over KOOTENAI R.;COPELAND BR.
Built 1969
STC 5804;WESTSIDE over TROUT CREEK;N.BRANCH
Built 1957
STC 5804;WESTSIDE over TROUT CREEK
Built 2020
STC 5805;WESTSIDE over PARKER CREEK
Built 1970
BIG BEND ROAD over PARKER CREEK;MORTER BR
Built 1983
US 95 over WILDLIFE UNDERPASS
Built 2004
US 95 over WILDLIFE UNDERPASS
Built 2004
US 95 over WILDLIFE UNDERPASS
Built 2004
YUKON ROAD over MISSION CREEK;KELLOGG BR
Built 1978
STC 5804;WESTSIDE over BALL CREEK
Built 1990
Bridge Details
- Structure #
- 000000000020721
- Year Built
- 2003
- Length
- 10.1 m (33.1 ft)
- Max Span
- 9.4 m
- Width
- 7.8 m (25.6 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $267,000
- Total Project Cost
- $401,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.