LULU STREET over BIG CANYON CREEK
IN PECK;NE SECTION · County 069, Idaho · Built 1920 · 1 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
46.476189, -116.422592
This bridge is in worse condition than 76.4% of bridges in County 069. The average bridge in Idaho is 0 years old; this one is 106 years old.
Nearby Bridges
STC4747;BIG CANYON over BEAR CREEK
Built 2019
STC 4747;CNTRL RDG over BIG CANYON CREEK
Built 1948
LITTLE CANYON ROAD over BIG CANYON CREEK
Built 1930
US 12 over BIG CANYON CREEK
Built 1984
SH 7 over N.FK. CLEARWATER RIVER
Built 1999
SUNNYSIDE BENCH over WHEELER CANYON CREEK
Built 2013
LENORE GRADE ROAD over CLEARWATER R;LENORE BR.
Built 1935
SH 7 over CLEARWATER RIVER
Built 1998
MAIN STREET over OROFINO CREEK
Built 1984
STC 4786;JOHNSON over OROFINO CREEK
Built 1978
Bridge Details
- Structure #
- 000000000029970
- Year Built
- 1920
- Length
- 34.1 m (111.9 ft)
- Max Span
- 32.9 m
- Width
- 6.3 m (20.7 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Steel
- Design
- Truss - Thru
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $809,000
- Total Project Cost
- $1,213,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.