STC 4747;CNTRL RDG over BIG CANYON CREEK
0.3 S. PECK · County 069, Idaho · Built 1948 · 2 Lanes · 30 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
46.478606, -116.425208
This bridge is in worse condition than 76.4% of bridges in County 069. The average bridge in Idaho is 0 years old; this one is 78 years old.
Nearby Bridges
STC4747;BIG CANYON over BEAR CREEK
Built 2019
LULU STREET over BIG CANYON CREEK
Built 1920
LITTLE CANYON ROAD over BIG CANYON CREEK
Built 1930
US 12 over BIG CANYON CREEK
Built 1984
SH 7 over N.FK. CLEARWATER RIVER
Built 1999
SUNNYSIDE BENCH over WHEELER CANYON CREEK
Built 2013
LENORE GRADE ROAD over CLEARWATER R;LENORE BR.
Built 1935
SH 7 over CLEARWATER RIVER
Built 1998
RIVER ROAD over BEDROCK CREEK;NW.LENORE
Built 1982
MAIN STREET over OROFINO CREEK
Built 1984
Bridge Details
- Structure #
- 000000000020230
- Year Built
- 1948
- Length
- 18.9 m (62 ft)
- Max Span
- 18.3 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 30
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $431,000
- Total Project Cost
- $646,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.