STC4747;BIG CANYON over BEAR CREEK

AT PECK NCL · County 069, Idaho · Built 2019 · 2 Lanes · 510 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000020236
Year Built
2019
Length
16.2 m (53.1 ft)
Max Span
15.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
510
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.