STC4747;BIG CANYON over BEAR CREEK
AT PECK NCL · County 069, Idaho · Built 2019 · 2 Lanes · 510 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
46.478472, -116.425194
This bridge is in worse condition than 9.7% of bridges in County 069. The average bridge in Idaho is 0 years old; this one is 7 years old.
Nearby Bridges
STC 4747;CNTRL RDG over BIG CANYON CREEK
Built 1948
LULU STREET over BIG CANYON CREEK
Built 1920
LITTLE CANYON ROAD over BIG CANYON CREEK
Built 1930
US 12 over BIG CANYON CREEK
Built 1984
SH 7 over N.FK. CLEARWATER RIVER
Built 1999
SUNNYSIDE BENCH over WHEELER CANYON CREEK
Built 2013
LENORE GRADE ROAD over CLEARWATER R;LENORE BR.
Built 1935
SH 7 over CLEARWATER RIVER
Built 1998
RIVER ROAD over BEDROCK CREEK;NW.LENORE
Built 1982
MAIN STREET over OROFINO CREEK
Built 1984
Bridge Details
- Structure #
- 000000000020236
- Year Built
- 2019
- Length
- 16.2 m (53.1 ft)
- Max Span
- 15.2 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 510
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.