OASIS ROAD over D LINE CANAL
11.5S. 2.6E. NEW PLYMOUTH · County 075, Idaho · Built 2000 · 2 Lanes · 700 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
43.806992, -116.767422
This bridge is in worse condition than 4.6% of bridges in County 075. The average bridge in Idaho is 0 years old; this one is 26 years old.
Nearby Bridges
OASIS ROAD over D LINE CANAL
Built 2000
OASIS ROAD over D LINE CANAL
Built 1975
I 84 EBL over D LINE CANAL
Built 1961
I 84 WBL over D LINE CANAL
Built 1961
OASIS ROAD over I 84;SAND HOLLOW IC
Built 2018
I 84 EBL over SAND HOLLOW CREEK
Built 1962
I 84 WBL over SAND HOLLOW CREEK
Built 1962
SE 11TH AVENUE over D LINE CANAL
Built 1965
S.E. 10TH AVENUE over D LINE CANAL
Built 2018
I 84 EBL over SE 9TH AVENUE GS
Built 1961
Bridge Details
- Structure #
- 000000000028432
- Year Built
- 2000
- Length
- 15.2 m (49.9 ft)
- Max Span
- 14.6 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 700
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $393,000
- Total Project Cost
- $590,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.