OASIS ROAD over D LINE CANAL
11.5S 3.2E NEW PLYMOUTH · County 075, Idaho · Built 1975 · 2 Lanes · 700 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.8069, -116.756161
This bridge is in worse condition than 20% of bridges in County 075. The average bridge in Idaho is 0 years old; this one is 51 years old.
Nearby Bridges
OASIS ROAD over I 84;SAND HOLLOW IC
Built 2018
OASIS ROAD over D LINE CANAL
Built 2000
I 84 EBL over D LINE CANAL
Built 1961
I 84 WBL over D LINE CANAL
Built 1961
OASIS ROAD over D LINE CANAL
Built 2000
I 84 WBL over SAND HOLLOW CREEK
Built 1962
I 84 EBL over SAND HOLLOW CREEK
Built 1962
SE 11TH AVENUE over D LINE CANAL
Built 1965
S.E. 10TH AVENUE over D LINE CANAL
Built 2018
SAND HOLLOW ROAD over I 84;SAND HOLLOW RD GS
Built 1962
Bridge Details
- Structure #
- 000000000028430
- Year Built
- 1975
- Length
- 11.6 m (38.1 ft)
- Max Span
- 10.7 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 700
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $337,000
- Total Project Cost
- $506,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.