SE 11TH AVENUE over D LINE CANAL
10.5S 3.4E NEW PLYMOUTH · County 075, Idaho · Built 1965 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.821722, -116.753639
This bridge is in worse condition than 61.5% of bridges in County 075. The average bridge in Idaho is 0 years old; this one is 61 years old.
Nearby Bridges
I 84 WBL over D LINE CANAL
Built 1961
I 84 EBL over D LINE CANAL
Built 1961
S.E. 10TH AVENUE over D LINE CANAL
Built 2018
OASIS ROAD over D LINE CANAL
Built 1975
OASIS ROAD over D LINE CANAL
Built 2000
OASIS ROAD over I 84;SAND HOLLOW IC
Built 2018
OASIS ROAD over D LINE CANAL
Built 2000
I 84 WBL over SAND HOLLOW CREEK
Built 1962
I 84 EBL over SAND HOLLOW CREEK
Built 1962
I 84 WBL over SE 9TH AVENUE GS
Built 1961
Bridge Details
- Structure #
- 000000000028330
- Year Built
- 1965
- Reconstructed
- 1989
- Length
- 9.8 m (32.2 ft)
- Max Span
- 8.8 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $245,000
- Total Project Cost
- $368,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.