FROZEN DOG ROAD over BLACK CANYON CANAL
1.2 N. 3.1 E. EMMETT · County 045, Idaho · Built 1977 · 2 Lanes · 150 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.893572, -116.436017
This bridge is in worse condition than 56.1% of bridges in County 045. The average bridge in Idaho is 0 years old; this one is 49 years old.
Nearby Bridges
FULLER ROAD over BLACK CANYON CANAL
Built 1976
SMA7190;SUBSTATION over LAST CHANCE CANAL
Built 2016
E. 12TH STREET over BLACK CANYON CANAL
Built 1955
STC 3838;PLAZA RD over PAYETTE RIVER;PLAZA BR.
Built 1959
E 10TH STREET over LAST CHANCE CANAL
Built 2008
SH 16 over BLACK CANYON CANAL
Built 1966
STC9584;CHERRY LN over BLACK CANYON CANAL
Built 1979
WARDWELL STREET over FARMERS COOP CANAL
Built 1990
SH 52 over PAYETTE RIVER;EMMETT BR.
Built 1971
SH 52 over FARMERS COOP CANAL
Built 1992
Bridge Details
- Structure #
- 000000000028070
- Year Built
- 1977
- Length
- 19.8 m (65 ft)
- Max Span
- 19.2 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 150
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $407,000
- Total Project Cost
- $611,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.