STC9584;CHERRY LN over BLACK CANYON CANAL
1.3 S. 1.8 E. EMMETT · County 045, Idaho · Built 1979 · 2 Lanes · 490 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.857156, -116.464911
This bridge is in worse condition than 24.6% of bridges in County 045. The average bridge in Idaho is 0 years old; this one is 47 years old.
Nearby Bridges
SH 16 over BLACK CANYON CANAL
Built 1966
E. 12TH STREET over BLACK CANYON CANAL
Built 1955
E 10TH STREET over LAST CHANCE CANAL
Built 2008
SMA7190;SUBSTATION over LAST CHANCE CANAL
Built 2016
STC3842;OLD FRZOUT over BLACK CANYON CANAL
Built 1950
SH 52 over FARMERS COOP CANAL
Built 2001
STC9589;SALES YARD over FARMERS COOP CANAL
Built 1970
STC7408;W 12TH ST over FARMERS COOP CANAL
Built 1965
STC7409;W 4TH ST over FARMERS COOP CANAL
Built 1960
WARDWELL STREET over FARMERS COOP CANAL
Built 1990
Bridge Details
- Structure #
- 000000000028060
- Year Built
- 1979
- Length
- 20.1 m (65.9 ft)
- Max Span
- 19.5 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 490
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $428,000
- Total Project Cost
- $642,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.