SH 16 over BLACK CANYON CANAL
1.8 S. EMMETT · County 045, Idaho · Built 1966 · 2 Lanes · 12,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 5 | Fair |
Location
43.858614, -116.463733
This bridge is in worse condition than 56.1% of bridges in County 045. The average bridge in Idaho is 0 years old; this one is 60 years old.
Nearby Bridges
STC9584;CHERRY LN over BLACK CANYON CANAL
Built 1979
E. 12TH STREET over BLACK CANYON CANAL
Built 1955
E 10TH STREET over LAST CHANCE CANAL
Built 2008
SMA7190;SUBSTATION over LAST CHANCE CANAL
Built 2016
STC3842;OLD FRZOUT over BLACK CANYON CANAL
Built 1950
SH 52 over FARMERS COOP CANAL
Built 2001
STC7408;W 12TH ST over FARMERS COOP CANAL
Built 1965
STC9589;SALES YARD over FARMERS COOP CANAL
Built 1970
WARDWELL STREET over FARMERS COOP CANAL
Built 1990
STC7409;W 4TH ST over FARMERS COOP CANAL
Built 1960
Bridge Details
- Structure #
- 000000000012160
- Year Built
- 1966
- Length
- 26.5 m (86.9 ft)
- Max Span
- 8.5 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 12,000
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $895,000
- Total Project Cost
- $1,342,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.