CAN-ADA ROAD over WALDVOGEL CANAL
13.3S 2.4E NAMPA CITY CTR · County 027, Idaho · Built 1980 · 2 Lanes · 280 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
43.385247, -116.5134
This bridge is in worse condition than 79.7% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 46 years old.
Nearby Bridges
BASELINE ROAD over WALDVOGEL CANAL
Built 2004
CAN-ADA ROAD over WALDVOGEL CANAL
Built 2007
DICKMAN ROAD over WALDVOGEL CANAL
Built 1950
ROBINSON ROAD over WALDVOGEL CANAL
Built 1997
TRACK ROAD over MORA CANAL
Built 1983
POWER LINE ROAD over MORA CANAL
Built 1987
E. STAGE COACH RD over MORA CANAL
Built 2004
STC3755;SOUTHSIDE over MORA CANAL
Built 1975
CAN-ADA ROAD over MORA CANAL
Built 1992
E. STAGE COACH RD over EAST MADDEN LATERAL
Built 2019
Bridge Details
- Structure #
- 000000000026970
- Year Built
- 1980
- Length
- 8.2 m (26.9 ft)
- Max Span
- 7.9 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 280
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $243,000
- Total Project Cost
- $365,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.