POWER LINE ROAD over MORA CANAL
9.5 S. 0.5 E. NAMPA · County 027, Idaho · Built 1987 · 2 Lanes · 140 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.440853, -116.552936
This bridge is in worse condition than 30.2% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 39 years old.
Nearby Bridges
TRACK ROAD over MORA CANAL
Built 1983
E. STAGE COACH RD over EAST MADDEN LATERAL
Built 2019
E. STAGE COACH RD over MORA CANAL
Built 2004
SH 45 over MORA CANAL
Built 1956
STC3755;SOUTHSIDE over MORA CANAL
Built 1975
CAN-ADA ROAD over MORA CANAL
Built 1992
LYNWOOD ROAD over MORA CANAL
Built 1998
DRY LAKE ROAD over MORA CANAL
Built 1987
ROBINSON ROAD over WALDVOGEL CANAL
Built 1997
SMA 3723;ROBINSON over MORA CANAL
Built 1984
Bridge Details
- Structure #
- 000000000026800
- Year Built
- 1987
- Length
- 15.5 m (50.9 ft)
- Max Span
- 7.6 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 140
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.