SMA 3723;ROBINSON over MORA CANAL
8.2 S. 3.4 E. NAMPA · County 027, Idaho · Built 1984 · 2 Lanes · 1,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.460086, -116.493492
This bridge is in worse condition than 30.2% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 42 years old.
Nearby Bridges
MURPHY ROAD over WALDVOGEL CANAL
Built 1971
CAN-ADA ROAD over MORA CANAL
Built 1992
STC3755;SOUTHSIDE over MORA CANAL
Built 1975
ROBINSON ROAD over WALDVOGEL CANAL
Built 1997
E. STAGE COACH RD over MORA CANAL
Built 2004
TRACK ROAD over MORA CANAL
Built 1983
TEN MILE ROAD over MORA CANAL
Built 1970
POWER LINE ROAD over MORA CANAL
Built 1987
E. STAGE COACH RD over EAST MADDEN LATERAL
Built 2019
DICKMAN ROAD over WALDVOGEL CANAL
Built 1950
Bridge Details
- Structure #
- 000000000026755
- Year Built
- 1984
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7.6 m
- Width
- 18.9 m (62 ft)
- Lanes
- 2
- Daily Traffic
- 1,200
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.