E. STAGE COACH RD over MORA CANAL
4.5 N. 0.5 W. MELBA · County 027, Idaho · Built 2004 · 2 Lanes · 200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.444656, -116.542211
This bridge is in worse condition than 30.2% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 22 years old.
Nearby Bridges
TRACK ROAD over MORA CANAL
Built 1983
STC3755;SOUTHSIDE over MORA CANAL
Built 1975
POWER LINE ROAD over MORA CANAL
Built 1987
E. STAGE COACH RD over EAST MADDEN LATERAL
Built 2019
CAN-ADA ROAD over MORA CANAL
Built 1992
SH 45 over MORA CANAL
Built 1956
LYNWOOD ROAD over MORA CANAL
Built 1998
SMA 3723;ROBINSON over MORA CANAL
Built 1984
ROBINSON ROAD over WALDVOGEL CANAL
Built 1997
DICKMAN ROAD over WALDVOGEL CANAL
Built 1950
Bridge Details
- Structure #
- 000000000026903
- Year Built
- 2004
- Length
- 40.2 m (131.9 ft)
- Max Span
- 18.3 m
- Width
- 18.3 m (60 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.