SMA3909;KUNA MORA over BLACKS CREEK
10.6 S. 5.5 E. BOISE · County 001, Idaho · Built 1968 · 2 Lanes · 1,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
43.459411, -116.0947
This bridge is in worse condition than 47.4% of bridges in County 001. The average bridge in Idaho is 0 years old; this one is 58 years old.
Nearby Bridges
I 84 EBL over KUNA RD; BLACKS CREEK RD
Built 2020
I 84 WBL over KUNA RD; BLACKS CREEK RD
Built 2020
SMA 9423;EISENMAN over I 84;ISAACS CANYON IC
Built 1997
SH 21 over BOISE RIVER
Built 1996
I 84 EBL over INDIAN CREEK
Built 1953
I 84 WBL over INDIAN CREEK
Built 1960
I 84 over SH 21;GOWEN RD IC
Built 2015
NHM7683;GOWEN RD over UNION PACIFIC RR
Built 2022
I 84 EBL over UPRR
Built 1969
I 84 WBL over UPRR
Built 1969
Bridge Details
- Structure #
- 000000000026190
- Year Built
- 1968
- Length
- 9.8 m (32.2 ft)
- Max Span
- 9.4 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,200
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $356,000
- Total Project Cost
- $534,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.