I 84 EBL over UPRR

BOISE SCL · County 001, Idaho · Built 1969 · 4 Lanes · 26,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000015760
Year Built
1969
Reconstructed
2014
Length
44.5 m (146 ft)
Max Span
16 m
Width
24 m (78.7 ft)
Lanes
4
Daily Traffic
26,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.