I 84 EBL over INDIAN CREEK
15.9 E. BOISE ECL · County 001, Idaho · Built 1953 · 2 Lanes · 15,250 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
43.391425, -116.004083
This bridge is in worse condition than 47.4% of bridges in County 001. The average bridge in Idaho is 0 years old; this one is 73 years old.
Nearby Bridges
Bridge Details
- Structure #
- 000000000015805
- Year Built
- 1953
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.3 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 15,250
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $326,000
- Total Project Cost
- $489,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.