STC 3805;SIMCO RD over I 84;BASELINE SIMCO IC
19.8 E. BOISE;BROADWAY · County 039, Idaho · Built 2024 · 2 Lanes · 850 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
43.344222, -115.953306
This bridge is in worse condition than 3.1% of bridges in County 039. The average bridge in Idaho is 0 years old; this one is 2 years old.
Bridge Details
- Structure #
- 000000000019856
- Year Built
- 2024
- Length
- 68.3 m (224.1 ft)
- Max Span
- 33.5 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 850
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.