3500 EAST ROAD over HIGH LINE CANAL
7.5 S. KIMBERLY · County 083, Idaho · Built 1968 · 2 Lanes · 1,300 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.435669, -114.330111
This bridge is in worse condition than 65.9% of bridges in County 083. The average bridge in Idaho is 0 years old; this one is 58 years old.
Nearby Bridges
3600 EAST ROAD over HIGH LINE CANAL
Built 1993
STC2739;3800 E. RD over ROCK CREEK
Built 1965
STC2739;3800 E. RD over HIGH LINE CANAL
Built 1935
3200 NORTH RD over HIGH LINE CANAL
Built 1971
3100 NORTH ROAD over COTTONWOOD CREEK
Built 1977
3600 EAST RD over LOW LINE CANAL
Built 1967
3500 EAST ROAD over LOW LINE CANAL
Built 1967
N 3700 E ROAD over LOW LINE CANAL
Built 1978
3400 NORTH ROAD over LOW LINE CANAL
Built 1978
3400 EAST ROAD over LOW LINE CANAL
Built 1982
Bridge Details
- Structure #
- 000000000025630
- Year Built
- 1968
- Length
- 22.6 m (74.1 ft)
- Max Span
- 7.3 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,300
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $500,000
- Total Project Cost
- $750,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.