STC2739;3800 E. RD over ROCK CREEK
6 S. HANSEN;3075N-3800E · County 083, Idaho · Built 1965 · 2 Lanes · 1,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.445469, -114.304858
This bridge is in worse condition than 65.9% of bridges in County 083. The average bridge in Idaho is 0 years old; this one is 61 years old.
Nearby Bridges
STC2739;3800 E. RD over HIGH LINE CANAL
Built 1935
3200 NORTH RD over HIGH LINE CANAL
Built 1971
3500 EAST ROAD over HIGH LINE CANAL
Built 1968
3600 EAST ROAD over HIGH LINE CANAL
Built 1993
3400 NORTH ROAD over LOW LINE CANAL
Built 1978
N 3700 E ROAD over LOW LINE CANAL
Built 1978
STC2739;3800 E. RD over LOW LINE CANAL
Built 1995
3600 EAST RD over LOW LINE CANAL
Built 1967
3100 NORTH ROAD over COTTONWOOD CREEK
Built 1977
3500 EAST ROAD over LOW LINE CANAL
Built 1967
Bridge Details
- Structure #
- 000000000019445
- Year Built
- 1965
- Reconstructed
- 1997
- Length
- 8.2 m (26.9 ft)
- Max Span
- 7.9 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,000
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $264,000
- Total Project Cost
- $396,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.