3200 NORTH RD over HIGH LINE CANAL

4.7 S. HANSEN · County 083, Idaho · Built 1971 · 2 Lanes · 1,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000025605
Year Built
1971
Length
29.3 m (96.1 ft)
Max Span
9.4 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,100
Material
Prestressed Concrete
Design
Tee Beam
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$696,000
Total Project Cost
$1,044,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.