370 SOUTH ROAD over MILNER GOODING CANAL
2.0 S. 0.3 E. DIETRICH · County 063, Idaho · Built 1944 · 2 Lanes · 100 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.879747, -114.262647
This bridge is in worse condition than 60.4% of bridges in County 063. The average bridge in Idaho is 0 years old; this one is 82 years old.
Nearby Bridges
650 EAST ROAD over MILNER GOODING CANAL
Built 1940
470 SOUTH ROAD over MILNER GOODING CANAL
Built 1985
550 EAST ROAD over MILNER GOODING CANAL
Built 1940
750 EAST ROAD over DIETRICH CANAL
Built 1971
3215: DYNAMITE CAV over Milner Gooding Canal
Built 2014
SH 24 over 702-A CANAL
Built 1976
STC2784;MILLARD RD over MILNER GOODING CANAL
Built 1955
SH 24 over MILNER GOODING CANAL
Built 2007
30 SOUTH ROAD over MILNER GOODING CANAL
Built 1977
3214: RUIZ LAKE over Dietrich Main Canal
Built 1987
Bridge Details
- Structure #
- 000000000025045
- Year Built
- 1944
- Reconstructed
- 1977
- Length
- 29 m (95.1 ft)
- Max Span
- 7.6 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $573,000
- Total Project Cost
- $859,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.