650 EAST ROAD over MILNER GOODING CANAL
1.8 S. 0.5 W. DIETRICH · County 063, Idaho · Built 1940 · 2 Lanes · 50 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.884444, -114.275556
This bridge is in worse condition than 73.6% of bridges in County 063. The average bridge in Idaho is 0 years old; this one is 86 years old.
Nearby Bridges
370 SOUTH ROAD over MILNER GOODING CANAL
Built 1944
550 EAST ROAD over MILNER GOODING CANAL
Built 1940
470 SOUTH ROAD over MILNER GOODING CANAL
Built 1985
750 EAST ROAD over DIETRICH CANAL
Built 1971
STC2784;MILLARD RD over MILNER GOODING CANAL
Built 1955
3215: DYNAMITE CAV over Milner Gooding Canal
Built 2014
SH 24 over MILNER GOODING CANAL
Built 2007
SH 24 over 702-A CANAL
Built 1976
30 SOUTH ROAD over MILNER GOODING CANAL
Built 1977
SH 75 over LITTLE WOOD RIVER
Built 1958
Bridge Details
- Structure #
- 000000000024985
- Year Built
- 1940
- Reconstructed
- 1977
- Length
- 27.4 m (89.9 ft)
- Max Span
- 5.5 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $540,000
- Total Project Cost
- $810,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.