30 SOUTH ROAD over MILNER GOODING CANAL

0.3 S. 1.8 E. SHOSHONE · County 063, Idaho · Built 1977 · 1 Lanes · 20 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
000000000024965
Year Built
1977
Length
24.1 m (79.1 ft)
Max Span
6.1 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
20
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$471,000
Total Project Cost
$706,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.