1900 EAST ROAD over MILNER GOODING CANAL
5.5 N. 3.0 E. EDEN · County 053, Idaho · Built 1965 · 1 Lanes · 30 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.720931, -114.16085
This bridge is in worse condition than 18.9% of bridges in County 053. The average bridge in Idaho is 0 years old; this one is 61 years old.
Nearby Bridges
2701: NORTH MILNER over Milner Gooding Canal
Built 1960
HUNT ROAD over T.F.NORTHSIDE MAIN CNL
Built 1960
EDEN ROAD (1600 E) over T.F.NORTHSIDE MAIN CANAL
Built 1991
1250 EAST ROAD over NORTHSIDE MAIN CANAL
Built 2013
2300 EAST ROAD over MILNER GOODING CANAL
Built 1975
3215: DYNAMITE CAV over Milner Gooding Canal
Built 2014
STC2744;1900 E. RD over C CANAL
Built 1965
2100 EAST ROAD over C CANAL
Built 1975
2000 EAST ROAD over C CANAL
Built 1974
2200 EAST ROAD over T.F.NORTHSIDE MAIN CNL
Built 1969
Bridge Details
- Structure #
- 000000000024620
- Year Built
- 1965
- Reconstructed
- 1990
- Length
- 18.9 m (62 ft)
- Max Span
- 8.8 m
- Width
- 5.4 m (17.7 ft)
- Lanes
- 1
- Daily Traffic
- 30
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $397,000
- Total Project Cost
- $596,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.