2000 EAST ROAD over C CANAL
0.8 S. 0.3 E. HAZELTON · County 053, Idaho · Built 1974 · 2 Lanes · 200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.584914, -114.128272
This bridge is in worse condition than 18.9% of bridges in County 053. The average bridge in Idaho is 0 years old; this one is 52 years old.
Nearby Bridges
2100 EAST ROAD over C CANAL
Built 1975
STC2744;1900 E. RD over C CANAL
Built 1965
I 84 WBL over STC2744;MURTAUGH RD GS
Built 1966
I 84 EBL over STC2744;MURTAUGH RD GS
Built 1966
990 SOUTH ROAD over C CANAL
Built 1962
990 SOUTH ROAD over C CANAL
Built 1965
I 84 over C CANAL
Built 1966
I 84 WBL over STC2767;VALLEY ROAD IC
Built 1966
I 84 EBL over STC2767;VALLEY ROAD IC
Built 1966
I 84 WBL over C CANAL
Built 1966
Bridge Details
- Structure #
- 000000000024555
- Year Built
- 1974
- Length
- 8.8 m (28.9 ft)
- Max Span
- 8.2 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $222,000
- Total Project Cost
- $333,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.