990 SOUTH ROAD over C CANAL

1.3 S. 2.5 E. HAZELTON · County 053, Idaho · Built 1962 · 2 Lanes · 110 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
000000000024605
Year Built
1962
Reconstructed
1979
Length
7.9 m (25.9 ft)
Max Span
7.6 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
110
Material
Prestressed Concrete
Design
Tee Beam
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$213,000
Total Project Cost
$319,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.