1600 EAST ROAD over DRY CREEK
3.4 N. 3.0 W. GOODING · County 047, Idaho · Built 1930 · 2 Lanes · 30 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.982358, -114.7811
This bridge is in worse condition than 65% of bridges in County 047. The average bridge in Idaho is 0 years old; this one is 96 years old.
Nearby Bridges
1400 SOUTH ROAD over DRY CREEK
Built 1930
1625 EAST ROAD over BIG WOOD RIVER
Built 1999
1550 EAST ROAD over DRY CREEK
Built 1930
NORTH ROAD over DRY CREEK
Built 1930
1700 SOUTH ROAD over BIG WOOD RIVER
Built 2023
1700 EAST ROAD over DOG CREEK
Built 1974
1800 EAST ROAD over BIG WOOD RIVER
Built 1958
SH 46 over N. GOODING LATERAL 1465
Built 1986
1750 SOUTH ROAD over T.F.NORTHSIDE MAIN CNL
Built 1930
SH 46 over BIG WOOD RIVER
Built 2022
Bridge Details
- Structure #
- 000000000024430
- Year Built
- 1930
- Reconstructed
- 1973
- Length
- 18.9 m (62 ft)
- Max Span
- 9.1 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 30
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $345,000
- Total Project Cost
- $518,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.