1625 EAST ROAD over BIG WOOD RIVER
1.7 N. 2.7 W. GOODING · County 047, Idaho · Built 1999 · 2 Lanes · 30 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.963381, -114.767347
This bridge is in worse condition than 27.5% of bridges in County 047. The average bridge in Idaho is 0 years old; this one is 27 years old.
Nearby Bridges
1700 SOUTH ROAD over BIG WOOD RIVER
Built 2023
1600 EAST ROAD over DRY CREEK
Built 1930
1800 EAST ROAD over BIG WOOD RIVER
Built 1958
1400 SOUTH ROAD over DRY CREEK
Built 1930
1750 SOUTH ROAD over T.F.NORTHSIDE MAIN CNL
Built 1930
4TH AVE. (1775 S.) over T.F.NORTHSIDE MAIN CNL
Built 1930
S 1800 E over LITTLE WOOD RIVER
Built 2023
US 93 over MILNER GOODING CANAL
Built 1987
7TH AVENUE WEST over T.F.NORTHSIDE MAIN CNL
Built 1930
SH 46 over BIG WOOD RIVER
Built 2022
Bridge Details
- Structure #
- 000000000024401
- Year Built
- 1999
- Length
- 42.1 m (138.1 ft)
- Max Span
- 20.4 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 30
- Material
- Steel
- Design
- Box Beam or Girders - Multiple
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $767,000
- Total Project Cost
- $1,150,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.