NORTH ROAD over DRY CREEK

5.2 N. 3.6 W. GOODING · County 047, Idaho · Built 1930 · 2 Lanes · 30 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000024375
Year Built
1930
Reconstructed
1972
Length
13.1 m (43 ft)
Max Span
6.4 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
30
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$296,000
Total Project Cost
$444,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.