1375 SOUTH ROAD over CANAL
4.3 N. 3.7 E. GOODING · County 047, Idaho · Built 1930 · 2 Lanes · 30 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.00045, -114.638669
This bridge is in worse condition than 65% of bridges in County 047. The average bridge in Idaho is 0 years old; this one is 96 years old.
Nearby Bridges
2300 EAST ROAD over BIG WOOD RIVER
Built 1930
2300 EAST ROAD over N.GOODING MAIN CANAL
Built 1985
STC2781;1300 S. RD over THORN CREEK
Built 1955
2400 EAST ROAD over GOODING MAIN CANAL
Built 1930
1400 SOUTH ROAD over POORMAN DITCH
Built 2024
2500 EAST ROAD over GOODING MAIN CANAL
Built 1930
SH 46 over NRTH GOODING MAIN CNL
Built 1983
620 NORTH ROAD over MILNER GOODING CANAL
Built 1960
SH 46 over N. GOODING LATERAL 1465
Built 1986
850 WEST ROAD over EAST MAIN CANAL
Built 2024
Bridge Details
- Structure #
- 000000000024385
- Year Built
- 1930
- Reconstructed
- 1962
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7.3 m
- Width
- 7.1 m (23.3 ft)
- Lanes
- 2
- Daily Traffic
- 30
- Material
- Concrete
- Design
- Slab
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $208,000
- Total Project Cost
- $312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.