300 NORTH ROAD over MAIN SOUTHSIDE CANAL

3.8N 1.2E DECLO;965E-300N · County 031, Idaho · Built 1976 · 2 Lanes · 480 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000024075
Year Built
1976
Length
21.6 m (70.9 ft)
Max Span
10.4 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
480
Material
Prestressed Concrete
Design
Tee Beam
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$650,000
Total Project Cost
$715,000