300 NORTH ROAD over MAIN SOUTHSIDE CANAL
3.8N 1.2E DECLO;965E-300N · County 031, Idaho · Built 1976 · 2 Lanes · 480 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.575897, -113.605236
This bridge is in worse condition than 86.3% of bridges in County 031. The average bridge in Idaho is 0 years old; this one is 50 years old.
Nearby Bridges
I 84 WBL over SOUTHSIDE CANAL
Built 1960
I 84 EBL over SOUTHSIDE CANAL
Built 1960
SH 25 over I 84;RUPERT-DECLO IC
Built 1960
950 EAST ROAD over MAIN SOUTH SIDE CANAL
Built 1992
SH 25 over SNAKE RIVER;DOWNARD BR
Built 1994
I 84 WBL over SNAKE RIVER
Built 2016
I 84 EBL over SNAKE RIVER
Built 2017
SH 25 over A-1 CANAL
Built 1950
SH 77 over F CANAL
Built 1960
200 SOUTH ROAD over A CANAL
Built 2003
Bridge Details
- Structure #
- 000000000024075
- Year Built
- 1976
- Length
- 21.6 m (70.9 ft)
- Max Span
- 10.4 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 480
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $650,000
- Total Project Cost
- $715,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.