I 84 EBL over SOUTHSIDE CANAL
9.4 E. BURLEY · County 031, Idaho · Built 1960 · 2 Lanes · 9,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.568581, -113.604011
This bridge is in worse condition than 21.4% of bridges in County 031. The average bridge in Idaho is 0 years old; this one is 66 years old.
Nearby Bridges
I 84 WBL over SOUTHSIDE CANAL
Built 1960
300 NORTH ROAD over MAIN SOUTHSIDE CANAL
Built 1976
950 EAST ROAD over MAIN SOUTH SIDE CANAL
Built 1992
SH 25 over I 84;RUPERT-DECLO IC
Built 1960
I 84 WBL over SNAKE RIVER
Built 2016
I 84 EBL over SNAKE RIVER
Built 2017
SH 25 over SNAKE RIVER;DOWNARD BR
Built 1994
SH 77 over F CANAL
Built 1960
SH 25 over A-1 CANAL
Built 1950
950 EAST ROAD over MAIN SOUTHSIDE CANAL
Built 2008
Bridge Details
- Structure #
- 000000000016405
- Year Built
- 1960
- Length
- 64.3 m (211 ft)
- Max Span
- 23.6 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 9,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,663,000
- Total Project Cost
- $2,495,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.