SH 25 over A-1 CANAL
2.9 SE RUPERT · County 067, Idaho · Built 1950 · 2 Lanes · 2,600 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.592331, -113.628903
This bridge is in worse condition than 79.1% of bridges in County 067. The average bridge in Idaho is 0 years old; this one is 76 years old.
Nearby Bridges
SH 25 over SNAKE RIVER;DOWNARD BR
Built 1994
200 SOUTH ROAD over A CANAL
Built 2003
SMA7812;100 S. RD. over A CANAL
Built 1973
I 84 WBL over SNAKE RIVER
Built 2016
SH 25 over I 84;RUPERT-DECLO IC
Built 1960
I 84 EBL over SNAKE RIVER
Built 2017
300 NORTH ROAD over MAIN SOUTHSIDE CANAL
Built 1976
300 SOUTH ROAD over A CANAL
Built 2004
I 84 WBL over SOUTHSIDE CANAL
Built 1960
200 NORTH ROAD over MAIN NORTHSIDE CANAL
Built 1974
Bridge Details
- Structure #
- 000000000013080
- Year Built
- 1950
- Length
- 10.1 m (33.1 ft)
- Max Span
- 9.4 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 2,600
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $353,000
- Total Project Cost
- $530,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.