NORTH PICABO ROAD over SILVER CREEK;N.PICABO B
0.6 N. PICABO · County 013, Idaho · Built 1989 · 2 Lanes · 140 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
43.318122, -114.066083
This bridge is in worse condition than 74% of bridges in County 013. The average bridge in Idaho is 0 years old; this one is 37 years old.
Nearby Bridges
US 20 over SILVER CREEK
Built 1979
US 20 over SILVER CREEK
Built 1979
KILPATRICK BR. RD. over SILVER CREEK
Built 1978
PRIEST ROAD over SILVER CREEK;S.E. PICABO
Built 1995
US 20 over LOVING CREEK
Built 1971
STC2814;LTL WOOD over LITTLE WOOD RIVER
Built 1978
STC2814;LTL WOOD over EAST CANAL
Built 1956
US 20 over GROVE CREEK
Built 1971
DRY CREEK ROAD over LITTLE WOOD RIVER
Built 1977
STOCKER CREEK ROAD over SILVER CREEK
Built 1977
Bridge Details
- Structure #
- 000000000023770
- Year Built
- 1989
- Length
- 13.7 m (44.9 ft)
- Max Span
- 6.7 m
- Width
- 6.9 m (22.6 ft)
- Lanes
- 2
- Daily Traffic
- 140
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $314,000
- Total Project Cost
- $471,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.