STOCKER CREEK ROAD over SILVER CREEK
0.2 N. 5.0 W. PICABO · County 013, Idaho · Built 1977 · 2 Lanes · 60 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.311103, -114.169161
This bridge is in worse condition than 29.2% of bridges in County 013. The average bridge in Idaho is 0 years old; this one is 49 years old.
Nearby Bridges
US 20 over GROVE CREEK
Built 1971
US 20 over LOVING CREEK
Built 1971
KILPATRICK BR. RD. over SILVER CREEK
Built 1978
US 20 over SILVER CREEK
Built 1979
NORTH PICABO ROAD over SILVER CREEK;N.PICABO B
Built 1989
PERO ROAD over BELLEVUE CANAL
Built 1993
US 20 over SILVER CREEK
Built 1979
US 20 over BIG WOOD RIVER
Built 2017
PRIEST ROAD over SILVER CREEK;S.E. PICABO
Built 1995
STC2822;GLENDALE R over GLENDALE CANAL
Built 2021
Bridge Details
- Structure #
- 000000000023765
- Year Built
- 1977
- Length
- 15.8 m (51.8 ft)
- Max Span
- 15.5 m
- Width
- 5.5 m (18 ft)
- Lanes
- 2
- Daily Traffic
- 60
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $360,000
- Total Project Cost
- $540,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.