US 20 over SILVER CREEK
8.9 W. CAREY · County 013, Idaho · Built 1979 · 2 Lanes · 2,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
43.317178, -114.104889
This bridge is in worse condition than 74% of bridges in County 013. The average bridge in Idaho is 0 years old; this one is 47 years old.
Nearby Bridges
KILPATRICK BR. RD. over SILVER CREEK
Built 1978
NORTH PICABO ROAD over SILVER CREEK;N.PICABO B
Built 1989
US 20 over LOVING CREEK
Built 1971
US 20 over GROVE CREEK
Built 1971
STOCKER CREEK ROAD over SILVER CREEK
Built 1977
US 20 over SILVER CREEK
Built 1979
PRIEST ROAD over SILVER CREEK;S.E. PICABO
Built 1995
STC2814;LTL WOOD over EAST CANAL
Built 1956
STC2814;LTL WOOD over LITTLE WOOD RIVER
Built 1978
DRY CREEK ROAD over LITTLE WOOD RIVER
Built 1977
Bridge Details
- Structure #
- 000000000015100
- Year Built
- 1979
- Length
- 31.4 m (103 ft)
- Max Span
- 10.7 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 2,000
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $884,000
- Total Project Cost
- $1,326,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.