E. RIVERDALE RD over BEAR RIVER

4.8 N. 2.3 E. PRESTON · County 041, Idaho · Built 1931 · 2 Lanes · 70 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000023350
Year Built
1931
Length
31.7 m (104 ft)
Max Span
30.5 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
70
Material
Steel
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$634,000
Total Project Cost
$950,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.