FOSTER CREEK RD over CUB RIVER;FOSTER CRK BR.

7.3 E. PRESTON · County 041, Idaho · Built 1998 · 2 Lanes · 20 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000023331
Year Built
1998
Length
8.2 m (26.9 ft)
Max Span
8.2 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
20
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.