SH 36 over BEAR RIVER

3.5 E. JCT SH 34 & SH 36 · County 041, Idaho · Built 1960 · 2 Lanes · 1,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000014075
Year Built
1960
Reconstructed
2007
Length
34.4 m (112.9 ft)
Max Span
11.3 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
1,300
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$813,000
Total Project Cost
$1,220,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.