E 600 N;N LAVASIDE over I 15 NB-SB;E 600 N GS
7.0 N. BLACKFOOT · County 011, Idaho · Built 1962 · 2 Lanes · 260 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
43.283647, -112.289694
This bridge is in worse condition than 17.1% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 64 years old.
Nearby Bridges
I 15 SBL over LAVA SIDE CANAL
Built 1962
I 15 NBL over LAVA SIDE CANAL
Built 1962
STC1837;W RIVER RD over PEOPLES CANAL
Built 1954
STC1837;W RIVER RD over ABERDEEN SPRINGFIELD CNL
Built 1981
I 15 NBL over PEOPLES CANAL
Built 1962
CHRISTENSEN; 150 E over PEOPLES CANAL
Built 1973
CHRISTENSEN; 150 E over ABERDEEN SPRINGFIELD CNL
Built 1973
I 15 SBL over PEOPLES CANAL
Built 1962
I 15 NBL over ABERDEEN SPRINGFIELD CNL
Built 1962
I 15 SBL over ABERDEEN SPRINGFIELD CNL
Built 1962
Bridge Details
- Structure #
- 000000000023135
- Year Built
- 1962
- Length
- 69.5 m (228 ft)
- Max Span
- 15.2 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 260
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,297,000
- Total Project Cost
- $1,946,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.