STC1837;W RIVER RD over ABERDEEN SPRINGFIELD CNL
5.6 N. 2.3 E. BLACKFOOT · County 011, Idaho · Built 1981 · 2 Lanes · 1,300 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.269861, -112.299414
This bridge is in worse condition than 76% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 45 years old.
Nearby Bridges
STC1837;W RIVER RD over PEOPLES CANAL
Built 1954
I 15 NBL over PEOPLES CANAL
Built 1962
I 15 NBL over ABERDEEN SPRINGFIELD CNL
Built 1962
I 15 SBL over PEOPLES CANAL
Built 1962
I 15 SBL over ABERDEEN SPRINGFIELD CNL
Built 1962
I 15 NBL over LAVA SIDE CANAL
Built 1962
ROSE ROAD over I 15; ROSE ROAD IC
Built 2020
I 15 SBL over LAVA SIDE CANAL
Built 1962
E 600 N;N LAVASIDE over I 15 NB-SB;E 600 N GS
Built 1962
I 15 NBL over RIVERSIDE CANAL
Built 1962
Bridge Details
- Structure #
- 000000000022865
- Year Built
- 1981
- Length
- 15.2 m (49.9 ft)
- Max Span
- 14.9 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,300
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $555,000
- Total Project Cost
- $833,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.