I 15 SBL over PEOPLES CANAL
5.8 N. BLACKFOOT · County 011, Idaho · Built 1962 · 2 Lanes · 14,250 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 5 | Fair |
Location
43.269803, -112.302739
This bridge is in worse condition than 76% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 64 years old.
Nearby Bridges
I 15 NBL over ABERDEEN SPRINGFIELD CNL
Built 1962
I 15 NBL over PEOPLES CANAL
Built 1962
I 15 SBL over ABERDEEN SPRINGFIELD CNL
Built 1962
STC1837;W RIVER RD over ABERDEEN SPRINGFIELD CNL
Built 1981
STC1837;W RIVER RD over PEOPLES CANAL
Built 1954
ROSE ROAD over I 15; ROSE ROAD IC
Built 2020
I 15 NBL over LAVA SIDE CANAL
Built 1962
I 15 NBL over RIVERSIDE CANAL
Built 1962
I 15 over RIVERSIDE CANAL
Built 2019
I 15 SBL over RIVERSIDE CANAL
Built 1962
Bridge Details
- Structure #
- 000000000011565
- Year Built
- 1962
- Length
- 24.4 m (80.1 ft)
- Max Span
- 11.9 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 14,250
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $721,000
- Total Project Cost
- $1,082,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.