HANSON ROAD over CEDAR POINT CANAL

0.1 N. 0.5 W. SHELLEY · County 011, Idaho · Built 1969 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000022625
Year Built
1969
Length
8.2 m (26.9 ft)
Max Span
8.2 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
400
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.