STC 1847; W FIR ST over CEDAR POINT CANAL
IN SHELLEY · County 011, Idaho · Built 1980 · 2 Lanes · 3,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.374197, -112.140236
This bridge is in worse condition than 17.1% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 46 years old.
Nearby Bridges
LONGHURST LANE over CEDAR POINT CANAL
Built 1987
STC 1847; FIR ROAD over GOVERNMENT CANAL
Built 1980
HANSON ROAD over CEDAR POINT CANAL
Built 1969
STC 1821;BASELINE over W BR SNAKE RVR VLY CANAL
Built 2001
PARK AVENUE over W.BR.SNAKE R.VALLEY CNL
Built 1981
SUGAR AVENUE over W.BR.SNAKE R.VALLEY CNL
Built 1981
E LOCUST STREET over SNAKE RIVER VALLEY CANAL
Built 2023
STC 1851; E CENTER over W.BR.SNAKE R.VALLEY CNL
Built 1966
STC 1847; E 1250 N over SNAKE RIVER;W.SHELLEY BR
Built 1965
FOUNDRY ROAD over W.BR.SNAKE R.VALLEY CNL.
Built 1983
Bridge Details
- Structure #
- 000000000019285
- Year Built
- 1980
- Length
- 12.2 m (40 ft)
- Max Span
- 12.2 m
- Width
- 14.6 m (47.9 ft)
- Lanes
- 2
- Daily Traffic
- 3,300
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $360,000
- Total Project Cost
- $540,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.