STC 1847; FIR ROAD over GOVERNMENT CANAL
1.2 W. SHELLEY · County 011, Idaho · Built 1980 · 2 Lanes · 3,300 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
43.374267, -112.151239
This bridge is in worse condition than 76% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 46 years old.
Nearby Bridges
LONGHURST LANE over CEDAR POINT CANAL
Built 1987
STC 1847; W FIR ST over CEDAR POINT CANAL
Built 1980
STC 1847; E 1250 N over SNAKE RIVER;W.SHELLEY BR
Built 1965
HANSON ROAD over CEDAR POINT CANAL
Built 1969
STC 1847; E 1250 N over GREAT WESTERN CANAL
Built 1959
STC 1821;BASELINE over W BR SNAKE RVR VLY CANAL
Built 2001
FOUNDRY RD;E 1100N over RESERVATION CANAL
Built 1987
PARK AVENUE over W.BR.SNAKE R.VALLEY CNL
Built 1981
SUGAR AVENUE over W.BR.SNAKE R.VALLEY CNL
Built 1981
FOUNDRY ROAD over W.BR.SNAKE R.VALLEY CNL.
Built 1983
Bridge Details
- Structure #
- 000000000019280
- Year Built
- 1980
- Length
- 18.3 m (60 ft)
- Max Span
- 18.3 m
- Width
- 28.5 m (93.5 ft)
- Lanes
- 2
- Daily Traffic
- 3,300
- Material
- Steel
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $436,000
- Total Project Cost
- $653,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.