F STREET over MAIN NORTHSIDE CANAL
AT ACEQUIA SCL;325N-365E · County 067, Idaho · Built 1960 · 2 Lanes · 250 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.665361, -113.59675
This bridge is in worse condition than 34.3% of bridges in County 067. The average bridge in Idaho is 0 years old; this one is 66 years old.
Nearby Bridges
STC2866;300 N. RD. over MAIN NORTHSIDE CANAL
Built 2001
SH 24 over B-1 CANAL
Built 1972
200 NORTH ROAD over MAIN NORTHSIDE CANAL
Built 1973
STC2866;300 N. RD. over MAIN NORTHSIDE CANAL
Built 1979
300 EAST ROAD over A CANAL
Built 1973
200 EAST ROAD over B-1 CANAL
Built 2019
SH 24 over B-2 CANAL
Built 1972
100 NORTH ROAD over A-1 CANAL
Built 1974
400 NORTH ROAD over MAIN NORTHSIDE CANAL
Built 1998
100 NORTH ROAD over A CANAL
Built 2009
Bridge Details
- Structure #
- 000000000019650
- Year Built
- 1960
- Length
- 28 m (91.9 ft)
- Max Span
- 14 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 250
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $662,000
- Total Project Cost
- $993,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.