100 NORTH ROAD over A CANAL
1.0 N. 1.9 E. RUPERT · County 067, Idaho · Built 2009 · 2 Lanes · 150 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.634111, -113.630972
This bridge is in worse condition than 14.9% of bridges in County 067. The average bridge in Idaho is 0 years old; this one is 17 years old.
Nearby Bridges
SH 24 over B-2 CANAL
Built 1972
100 EAST ROAD over A CANAL
Built 1968
100 NORTH ROAD over MAIN NORTHSIDE CANAL
Built 1975
200 NORTH ROAD over MAIN NORTHSIDE CANAL
Built 1974
100 EAST ROAD over B-2 CANAL
Built 2017
100 NORTH ROAD over A-1 CANAL
Built 1974
SH 25 over A CANAL
Built 2000
STC2866;BASELINE over A-1 CANAL
Built 1996
300 EAST ROAD over A CANAL
Built 1973
SH 24 over B CANAL
Built 1983
Bridge Details
- Structure #
- 000000000025251
- Year Built
- 2009
- Length
- 18.3 m (60 ft)
- Max Span
- 9.1 m
- Width
- 14.6 m (47.9 ft)
- Lanes
- 2
- Daily Traffic
- 150
- Material
- Concrete Continuous
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,287,000
- Total Project Cost
- $1,930,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.